This paper introduced the design strategy, process diagram, operation parameter and application results of a by-pass system installed in a cement plant in Japan. The operation results shows that adopt by-pass system is an effective measure to prevent coating and clogging when sulfur, chlorine and alkali constitute increasing coursed by handling industry wastes on cement kiln.