Please wait a minute...
水泥技术, 2019, 1(3): 77-80    doi: 10.19698/j.cnki.1001-6171.20193077
  余热发电 本期目录 | 过刊浏览 | 高级检索 |
水泥工厂余热电站站用电率计算方法分析
中材节能股份有限公司
Analysis for Power Comsumption Rate Calculation Method of WHR Power Station
Sinoma Energy Conservation Limited
下载:  PDF (2031KB) 
输出:  BibTeX | EndNote (RIS)      
摘要 水泥工厂余热电站设计阶段站用电率的计算值往往和实际值偏差较大,影响到项目立项阶段的经济评价及报价阶段方案的技术竞争力。在分析余热电站运行工况的基础上,详细划分电站负荷类型,优化站用电率计算方法。根据改进后的计算方法得到的站用电率与实际站用电率相比,误差约为3%。
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
武猛
关键词:  余热电站  站用电率  运行工况  负荷分析    
Abstract: The calculated value of power consumption rate  often deviates greatly from the actual value in design stage of cement plant's WHR power station, that will affect the economic evaluation in the project initiation stage and the technical competitiveness in the project quotation stage. Based on the analysis of the WHR power station running conditions, the load types are divided in detail, and then the calculation method of power consumption rate is improved. Compared with the actual value, the error of the improved calculation method is about 3%.
Key words:  WHR power station    power consumption rate    running condition    load analysis
收稿日期:  2018-12-12                出版日期:  2019-05-25      发布日期:  2019-05-29      整期出版日期:  2019-05-25
ZTFLH:  TQ172.622.22  
引用本文:    
武猛.
水泥工厂余热电站站用电率计算方法分析
[J]. 水泥技术, 2019, 1(3): 77-80.
WU Meng. Analysis for Power Comsumption Rate Calculation Method of WHR Power Station. Cement Technology, 2019, 1(3): 77-80.
链接本文:  
http://www.cemteck.com/CN/10.19698/j.cnki.1001-6171.20193077  或          http://www.cemteck.com/CN/Y2019/V1/I3/77
[1] 周庆忠, 田雷.
ETAP软件在余热电站谐波计算中的应用
[J]. 水泥技术, 2018, 1(6): 84-88.
[2] 汪佳杰.
三次风锅炉在水泥窑余热电站的应用
[J]. 水泥技术, 2018, 1(4): 94-96.
[3] 李明君. 新型连续排污扩容器[J]. 水泥技术, 2018, 1(4): 97-99.
[4] 侯跃光. 余热电站机组振动异常的几种原因分析[J]. 水泥技术, 2018, 1(3): 80-83.
[5] 李大庆, 杨晶婧. 水泥厂余热发电站发电机定子接地保护[J]. 水泥技术, 2017, 1(5): 92-95.
[6] 周庆忠. ETAP软件在余热电站接地网设计的应用[J]. 水泥技术, 2017, 1(5): 96-99.
[7] 于长江.
余热电站并网联络线路继电保护定值的配合分析
[J]. 水泥技术, 2016, 1(6): 82-84.
[8] 李大庆, 田雷.
水泥厂余热电站发电机中性点接地方式的研究
[J]. 水泥技术, 2016, 1(5): 72-74.
[9] 王林, 祝强.
水泥生产线余热电站仿真系统
[J]. 水泥技术, 2013, 1(5): 99-104.
[10] 王国彬, 赖铁钢.
浅谈水泥余热电站在线化学仪表的配置
[J]. 水泥技术, 2013, 1(4): 103-105.
[1] . Review and Prospect of Engineering Practice of Waste Disposal in Cement Kiln in China[J]. Cement Technology, 2018, 1(1): 17 -21 .
[2] DI Dongren, TAO Congxi, CHAI Xingteng. Revision of Cement Energy Consumption Standards and Energy Saving Technology(Ⅰ)[J]. Cement Technology, 2018, 1(1): 22 -26 .
[3] MA Debao. Finite Element Analysis of Inverted Cone in Raw Meal Silo[J]. Cement Technology, 2018, 1(1): 35 -38 .
[4] XIE Jianzhong, LIAN Xuewen. Analysis and Solution of Segregation of the Kiln Ash in Continuous Raw Meal Homogenization Silo#br#[J]. Cement Technology, 2018, 1(1): 49 -53 .
[5] WEI Can, ZHANG Yuanyuan, AI Jun. Application of Cement Intelligent Control System in Overseas Projects[J]. Cement Technology, 2018, 1(1): 60 -64 .
[6] WANG Qingjiang. Analysis on Mechanical Performance of Typical Joints in Tubular Frame Structure[J]. Cement Technology, 2018, 1(1): 83 -88 .
[7] HOU Ying, YANG Jingjing. Application of Electric Tracing in Waste Heat Generation of Cement Production Line[J]. Cement Technology, 2018, 1(1): 92 -95 .
[8] BAN Jianhong. Technical Experience of MLS3726 Raw Meal Roller Grinding System Modification to Improve Capacity and Reduce Consumption#br#[J]. Cement Technology, 2018, 1(1): 98 -102 .
[9] YAO Piqiang, HAN Hui, YU Weimin. Study on Calcining and Preliminary Application of New Low Calcium Cement[J]. Cement Technology, 2018, 1(2): 17 -25 .
[10] DOU Haijian, WANG Weili, QIN Zhonghua, DU Xin, CHAI Xingteng, YU Tao. The Flow Analysis Research of the Pressure Frame Wear Problem in a Roller Mill[J]. Cement Technology, 2018, 1(2): 26 -30 .
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
    PDF Preview