水泥技术, 2026, 1(2): 78-83    doi: 10.19698/j.cnki.1001-6171.20262078
  工程技术 本期目录 | 过刊浏览 | 高级检索 |
水泥厂窑尾预热器改造中的结构问题与对策
中国建材装备集团有限公司天津水泥工业设计研究院有限公司,天津  300133
Structural Problems and Countermeasures in Preheater Retrofit of Cement Plants
CNBM Equipment Group , Tianjin Cement Industry Design & Research Institute Co., Ltd. , Tianjin 300133, China
下载:  PDF (4189KB) 
输出:  BibTeX | EndNote (RIS)      
摘要 
在水泥工业绿色低碳转型与产能升级背景下,窑尾预热器改造是提升能效、节能减排的关键举措, 其结构适配、荷载传递及施工安全等问题至关重要。本文基于工程实践,针对五级预热器内部改造中的 结构问题,系统梳理了塔架内分解炉加高改造、塔架外新增分解炉改造(悬挑方案与立柱落地方案)以及五级预热器改六级预热器等典型改造类型,深入分析了各类方案的结构特点、受力性能与技术难点;总结了钢梁、钢 柱、地基基础、柱脚节点及钢管混凝土柱脱空缺陷等关键部位的加固技术,并提出了以“调查-检测-验算-评 定”为核心的结构检测鉴定流程。最后,指出五级预热器改七级预热器等更高难度改造的结构加固,需从荷载优化、 分析方法创新和新型加固技术应用三个方面持续突破,为行业同类工程提供技术支撑。
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
全明
关键词:  预热器改造  结构加固  荷载分析  脱空处理  检测鉴定    
Abstract: 
Against the backdrop of the green and low-carbon transformation and capacity upgrading of the cement industry, the retrofit of the kiln tail preheater is a key measure to improve energy efficiency and realize energy conservation and emission reduction, issues such as structural compatibility, load transmission and construction safety are of crucial importance. Based on engineering practice, aiming at the structural problems in the internal retrofit of the 5-stage preheater, this paper systematically sorts out typical renovation types including the heightening renovation of the precalciner inside the preheater tower, the addition of a new precalciner outside the tower (supported column scheme ), and the transformation of the 5-stage preheater into a 6-stage one, and deeply analyzes the structural characteristics, mechanical behavior and technical difficulties of various schemes. It summarizes the reinforcement technologies for key parts such as steel beams, steel columns, foundation, column base joints and the void defects of concrete-filled steel tube columns, and proposes a structural inspection and appraisal process with "investigation-detection-calculation-evaluation" as the core. Finally, it is pointed out that the structural reinforcement for more difficult renovations such as the upgrading from 5-stage to 7-stage preheater needs continuous breakthroughs in three aspects: load optimization, innovation of analysis methods and application of new reinforcement technologies, so as to provide technical support for similar projects in the industry.
Key words:  preheater retrofit    structural reinforcement    load analysis    void treatment    inspection and appraisal
收稿日期:  2025-07-18      修回日期:  2026-03-25           出版日期:  2026-03-25      发布日期:  2026-03-25      整期出版日期:  2026-03-25
ZTFLH:  TQ172.6  
  TU398  
通讯作者:  全明(1984—),男,硕士,高级工程师,主要从事水泥厂建筑结构设计。    E-mail:  quanming@sinoma-tianjin.cn
引用本文:    
全明. 水泥厂窑尾预热器改造中的结构问题与对策[J]. 水泥技术, 2026, 1(2): 78-83.
QUAN Ming. Structural Problems and Countermeasures in Preheater Retrofit of Cement Plants. Cement Technology, 2026, 1(2): 78-83.
链接本文:  
http://www.cemteck.com/CN/10.19698/j.cnki.1001-6171.20262078  或          http://www.cemteck.com/CN/Y2026/V1/I2/78
[1] 孙锐, 杨恒杰, 杨超, 马寅博, 苏辰. 水泥熟料烧成系统综合优化改造实践[J]. 水泥技术, 2025, 1(4): 12-18.
[2] 项阳, 熊利剑, 刘明辉.
水泥粉磨车间框架结构动力特性及加固研究
[J]. 水泥技术, 2011, 1(4): 92-94.
No Suggested Reading articles found!
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
    PDF Preview