Abstract: Taking a design project of a co-processing vein industrial park as an example, this paper introduces the basic situation and corresponding characteristics of the park construction. It explains the specific design process of the subunit such as municipal solid waste, kitchen waste, construction waste and hazardous waste of industrial park separately,and analyses the process characteristics of waste disposal, material interoperability and energy utilization etc. By the practice of this waste collaborative disposal project, it can bring certain demonstration effects to the cement kiln co-processing venous industry project, and promote the green development of the cement industry.