The following is the parameter of the clinker silo in Algeria Bis project, 60m in diameter, 450mm in thickness, 25.15m in height and the 1 500~750 mm ring beam in the upper part. The normal construction technology are form working by scaffolding, traditional tripod and slipping formwork (due to there is no resource of the crawl frame way, so that is not be considered). After the evaluated to the above method, those are not suit for this construction based on the time schedule,quality and safe. Considering the resource of site, a new kind of tripod method is developed by Algeria,through the operating platform of improving system, large formwork supporting system, changing the quality control method, updating the construction process and using the new equipment. Application of the new method achieved the expected goal thought the testing of the Bis project. It has received good results in terms of progress, quality and safety, and has been successful in both improving work efficiency and economic efficiency.
[J]. 水泥技术, 2018, 1(4): 73-79.
SUN Xiaoyong, GU Jinjun. Application of a New Three-foot Scaffold Reverse Die Construction Method in Clinker Silo. Cement Technology, 2018, 1(4): 73-79.