Please wait a minute...
水泥技术, 2021, 1(1): 96-98    doi: 10.19698/j.cnki.1001-6171.20211096
  技术改造 本期目录 | 过刊浏览 | 高级检索 |
浅谈水泥库卸料气路技术改造
甘肃金昌水泥集团有限责任公司
Discussion on Technical Transformation of Unloading Gas Circuit in Cement Silo
Gansu Jinchang Cement Group Co., Ltd.
下载:  PDF (5829KB) 
输出:  BibTeX | EndNote (RIS)      
摘要 某公司干法二厂水泥库内大量积料,清库工作难度大,危险系数高。经分析库内水泥结块原因,通过采取压缩空气助流卸料技术,在卸料口架设压缩空气管路,采用压缩空气进行卸料装车,保持卸料口处水泥流动,解决了水泥库水泥长期积存结块的问题。
服务
把本文推荐给朋友
加入引用管理器
E-mail Alert
RSS
作者相关文章
何有杰
阮黎明
关键词:  水泥库  卸料囗  压缩空气  气路改造    
Abstract: There is a large amount of accumulated material in the cement silo of the second dry process plant of a company, which makes it difficult to clear the silo and has a high risk factor. After analyzing the causes of cement caking in the silo, the compressed air pipeline was erected at the unloading port by adopting the compressed air assisted discharge technology, and the compressed air was used for unloading to keep the cement flowing at the unloading port, thus solving the problem of long-term accumulation and caking of cement in the cement silo.
Key words:  cement bunker    discharge opening    compressed air    gas path reconstruction
收稿日期:  2020-07-21                出版日期:  2021-01-25      发布日期:  2021-02-04      整期出版日期:  2021-01-25
ZTFLH:  TQ172.683  
引用本文:    
何有杰, 阮黎明.
浅谈水泥库卸料气路技术改造
[J]. 水泥技术, 2021, 1(1): 96-98.
HE Youjie, RUAN Liming. Discussion on Technical Transformation of Unloading Gas Circuit in Cement Silo. Cement Technology, 2021, 1(1): 96-98.
链接本文:  
http://www.cemteck.com/CN/10.19698/j.cnki.1001-6171.20211096  或          http://www.cemteck.com/CN/Y2021/V1/I1/96
[1] 何纪纲, 尚义华, 李丰敏, 付慧芳.
空气炮在解决水泥库出库溜子堵塞中的应用
[J]. 水泥技术, 2020, 1(2): 103-104.
[1] . Review and Prospect of Engineering Practice of Waste Disposal in Cement Kiln in China[J]. Cement Technology, 2018, 1(1): 17 -21 .
[2] DI Dongren, TAO Congxi, CHAI Xingteng. Revision of Cement Energy Consumption Standards and Energy Saving Technology(Ⅰ)[J]. Cement Technology, 2018, 1(1): 22 -26 .
[3] LIU Yonggang, GAO Hongwei, XIAO Guiqing. Design Method of Road Structure Using Lean Concrete Base[J]. Cement Technology, 2018, 1(1): 27 -31 .
[4] LIU Xu, LI Liang. Investigation of New Medium Temperature Wear-resistant Alloy Steel[J]. Cement Technology, 2018, 1(1): 32 -34 .
[5] MA Debao. Finite Element Analysis of Inverted Cone in Raw Meal Silo[J]. Cement Technology, 2018, 1(1): 35 -38 .
[6] HAN Zhongqi. [J]. Cement Technology, 2018, 1(1): 38 -48 .
[7] XIE Jianzhong, LIAN Xuewen. Analysis and Solution of Segregation of the Kiln Ash in Continuous Raw Meal Homogenization Silo#br#[J]. Cement Technology, 2018, 1(1): 49 -53 .
[8] GUAN Laiqing, HE Yongxian. [J]. Cement Technology, 2018, 1(1): 54 -59 .
[9] WEI Can, ZHANG Yuanyuan, AI Jun. Application of Cement Intelligent Control System in Overseas Projects[J]. Cement Technology, 2018, 1(1): 60 -64 .
[10] JIN Shuang. [J]. Cement Technology, 2018, 1(1): 72 -73 .
Viewed
Full text


Abstract

Cited

  Shared   
  Discussed   
    PDF Preview