Abstract: Introduced the composition of the optimized control system, and compared effect of drum water level, hot well water level, main feed water pressure after applying application optimization control. The waste heat power station is running more stable after applying optimization control. It makes workers reduce labor intensity and improve the automation control level of waste heat power station. Also it lay the foundation for few people on duty or quasi-unattended in waste heat power station.
董伟强. 优化控制系统在水泥窑余热电站上的应用[J]. 水泥技术, 2021, 1(4): 97-101.
DONG Weiqiang. Application of Optimization Control System on Cement Kiln Waste Heat Power Station. Cement Technology, 2021, 1(4): 97-101.