Application of Mining Pit Management and Road Construction Optimization Design |
1. Hebei Building Materials Industry Design and Research Institute; 2. Tianjin Cement Industry Design & Research Institute Co., Ltd. |
|
|
Abstract By comparison, the design scheme of combining mining pit management with road construction of mining transportation based on filling is determined. When the mining road passes through the mining pit, it is a high fill section. The high fill not only lowers the height of the mining pit slope, but also increases the stability of the mining pit slope. In the completion of road construction, it at the same time controls the pit, restores the ecological environment, beautifies the landscape, and saves the cost of pit management.
|
Received: 26 April 2021
Published: 22 November 2021
|
|
|
|