N-TGD Wire Rope Belt Bucket Elevator " />
Installation and Debugging of
N-TGD Wire Rope Belt Bucket Elevator
Home
About Us
Editorial Board
Instruction
Subscription
Advertisement
Contact Us
Chinese
Cement Technology,
2014
,
1
(6)
: 44-46
doi
:
Current Issue
|
Archive
|
Adv Search
|
Installation and Debugging of
N-TGD Wire Rope Belt Bucket Elevator
Shangrao Sinoma Machinery Co., Ltd.
Abstract
Figure/Table
References
Related Citation (15)
Download:
PDF
(1309KB)
Export:
BibTeX
|
EndNote
(RIS)
Received:
16 March 2014
Published:
30 May 2018
:
TQ172.687
Service
E-mail this article
Add to my bookshelf
Add to citation manager
E-mail Alert
RSS
Articles by authors
ZENG Hongwei
Cite this article:
ZENG Hongwei.
Installation and Debugging of
N-TGD Wire Rope Belt Bucket Elevator
[J]. Cement Technology, 2014, 1(6): 44-46.
URL:
http://www.cemteck.com/EN/
OR
http://www.cemteck.com/EN/Y2014/V1/I6/44
[1]
LIN Renzhang, SHI Jiageng.
Introduction of the Integrated Long Belt Conveyor in Sinoma DANGOTE Project
[J]. Cement Technology, 2018, 1(2): 50-55.
PDF Preview