Retrofit of 2500t/d Clinker Pyro-processing System
Collect
TAO Cong-xi, DONG Rui, ZHONG Ke-hui, HUANG Mao, CHEN Ting-wei, LIU Chang-suo, SU Xing-hui, LIANG Qian, CHEN Xue-yong, MA Yu-guo, LI Guo-jun
Cement Technology, 2014, 1(6): 17-19.
In order to further improve the production capacity and reduce the clinker heat consumption, Guangxi CRC Hongshuihe cement Co., Ltd. entrusted Sinoma Technology & Equipment Group Co., Ltd. to reconstruct its pyro-processing system of 2500 t/ d clinker production line in the former of general contracting . After the reconstruction, the pyro-processing system was running in good condition, the clinker output could reach 2970t/d and energy consumption was decreased significantly. Besides, the cooler was in stable and efficient operation and heat recovery efficiency had a substantial increase. This reconstructed project has achieved the desired results of energy saving.