After the
introduction of new energy power generation technology in cement factories, how
to reasonably set up electricity metering points and new energy power
generation access points is related to the safety, stability, and economy of
the cement factory's power system. This paper elaborates on the layout plan of
the electrical energy metering and analysis system for a cement production
line. Based on the layout of the electrical energy metering system, grid
connection voltage level, and capacity requirements, the selection of access
point schemes for three new energy generation methods, namely photovoltaic
power generation, wind power generation, and waste heat power generation, is
proposed. By reasonably planning the layout of the cement plant's electricity
metering system and the access points for new energy generation, real-time and
comprehensive collection of cement plant power system operation data can be
achieved. It optimizies electricity management, and further achievies energy
conservation and consumption reduction.