Abstract: The general layout of the original and the new 5 000t/d clinker production line were analyzed and compared at the raw fuel storage area, clinker production area; cement production area and product delivery area. The auxiliary raw material storage yard, mixed material storage shed, mixed material transportation, coal transportation and other links of the new production line are highly mechanized, with high environmental protection standards, and each process is beautiful and has distinct features.
[J]. 水泥技术, 2020, 1(4): 27-30.
LIU Fangquan, LIU Yonggang, CHEN Wenhui, LI Xiaoyu. A Brief Discussion on the General Layout Characteristics of Cement Project. Cement Technology, 2020, 1(4): 27-30.