A New Way to Upgrade Cooler of 2 500t/d Cement Clinker Line
Collect
YOU Xiaoping, CHEN Bin, ZHOU Bin, XU Guang
Cement Technology, 2021, 1(1): 21-23.
doi:10.19698/j.cnki.1001-6171.20211021
The cooler of the 2 500t/d cement clinker line, shows problems after several years running. The temperature of clinker out of cooler is higher, the temperature of secondary and tertiary air is lower, and the efficiency of heat recovery is lower. Then it keeps the upper and lower cases, reforms the inner of cooler with SINO-WALK grate, drive devices and end roller crusher. The output and heat recovery efficiency are significantly improved. The temperature of clinker out of cooler is 90~95℃, and the heat recovery efficiency is 74.9%. The process parameters reach the advanced level in the same scale production lines in China.
Related Articles |
Metrics
|
|
Introduction and Application of SIMATIC PCS 7 DCS System
Collect
ZHANG Yu, WAN Wenxian, JING Yufei
Cement Technology, 2021, 1(1): 28-30.
doi:10.19698/j.cnki.1001-6171.20211028
This paper briefly introduces the design and function of SIMATIC PCS 7 automatic control system. A 110t/h cement grinding production line project adopts PROFIBUS DP and Modbus communication mode to exchange data with DCS system. The developed HMI can realize data acquisition, data monitoring, alarm record, equipment operation, process parameter modification, event record, trend archive and other functions. The system runs stably and has strong processing ability, the hardware and software of DCS system can be expanded flexibly.
Related Articles |
Metrics
|
|
Kiln Measuring and Adjusting Method for Rotary Kiln
Collect
ZHAO Xinlei
Cement Technology, 2021, 1(1): 31-33.
doi:10.19698/j.cnki.1001-6171.20211031
After the rotary kiln is overhauled, the original fittings are worn to varying degrees, and the big gear ring vibrates after starting, so the kiln requires to be stopped for adjustment. According to the measured data of each gear elevation and big gear ring, the rotary kiln is adjusted. After adjustment, the rotary kiln runs smoothly, the vibration values of the pinion in axial, horizontal and vertical directions are all ≯2.5mm, and the temperature of the roller shoe in each gear is stable between 38℃ and 43℃.
Related Articles |
Metrics
|
|
Measures and Effects of Ultra-low Emission Technical Transformation of a 4 500t/d Clinker Production Line
Collect
ZHANG Shaoming, LIU Hongbao, ZHANG Yaozhi, HONG Bao
Cement Technology, 2021, 1(1): 50-56.
doi:10.19698/j.cnki.1001-6171.20211050
In this paper, the transformational scheme of MFC decomposition furnace & 5-stage single series cyclone preheater system is introduced. The scheme adopts self-reducing denitrification technology and adjusts the access position of 3rd-air pipes and the feeding position of C4 cyclone tube. In addition, this scheme also adopts the heavy hammer compression kiln tail seal, and the energy-saving strong swirly flow into the furnace combustion device without external air. After the transformation, due to the lower resistance of system, the average power consumption is reduced by 1.62kW·h/t.cl, the standard-coal consumption reduced by 3.15kg/t.cl, and the NOx emission value controlled less than 100mg/Nm3, which meets the emission requirement.
Related Articles |
Metrics
|
|
Cost Control of EPC Project Based on BIM Technique
Collect
GAO Qi
Cement Technology, 2021, 1(1): 68-72.
doi:10.19698/j.cnki.1001-6171.20211068
The paper analyzes the project cost at the problems existing in the work, introduces a 3d model based on BIM technology integration (3D), the construction schedule (4D), the cost (5D) in the integration of new engineering cost management pattern, which can realize overall planning at the beginning of the project's preliminary quotation, change management of ongoing projects, economic indicators of the project controls, project measurement payment, etc. In construction process, contract, schedule, cost, quality, safety and other information can be integrated into BIM platform, form an integrated engineering digital information base, the participants in each stage can utilize all kinds of engineering information in real time and efficiently as needed. It greatly improved the accuracy of the calculation of quantities, calculation accuracy and computational efficiency.
Related Articles |
Metrics
|
|
Classification of Expansive Soil and Construction Scheme of Foundations in Expansive Soil Area
Collect
QUAN Ming
Cement Technology, 2021, 1(1): 73-77.
doi:10.19698/j.cnki.1001-6171.20211073
The identification and classification criteria of expansive soil in China, America, France and India are introduced. For Chinese, American, French and Indian code, free swelling ratio, multiple methods, swelling pressure and multi-index comprehensive method is adopted respectively. Meanwhile, the construction methods such as micro pile, short pile and stress offset method for foundation engineering in expansive soil area under different identification and classification criteria are presented.
Related Articles |
Metrics
|
|
Production Experimental of Retarding Clinker
Collect
SUN Shihua, LOU Meishan, XING Yu, LOU Kaixiang
Cement Technology, 2021, 1(1): 78-80.
doi:10.19698/j.cnki.1001-6171.20211078
Fluorite tailings contain 15% ~ 20% calcium fluoride. During clinker calcination, adding a certain proportion of fluorite tailings can obviously prolong clinker setting time, the initial setting time of clinker is prolonged from 85 ~ 95min to 205 ~ 304min, and the final setting time is prolonged from 130 ~ 150min to 267 ~ 387min. At the same time, the burnability of raw meal is improved, the production of retarded clinker is stabilized, the cement performance is optimized, and the performance requirements of retarded cement for special projects are met.
Related Articles |
Metrics
|
|
Application of High Temperature and Ultra-high Pressure Primary Reheat Unit in Small Coal-fired Power Station
Collect
FENG Shuai, ZHAI Yingqiang, WANG Caixia
Cement Technology, 2021, 1(1): 99-104.
doi:10.19698/j.cnki.1001-6171.20211099
At present, the thermal parameters of high temperature and high pressure are widely used in the small-scale coal-fired power plants below 50MW. The engineering examples show that the overall efficiency of the power station can be further improved, and the coal consumption and operation cost can be reduced by using the parameters of the high temperature and ultra high pressure primary reheating system in the small coal-fired power station below 50MW. Compared with the traditional high temperature and high pressure system, the system efficiency, coal consumption, operating costs, investment payback period and other indicators are greatly improved.
Related Articles |
Metrics
|
|